Residential structural engineer for manufactured homes, FHA reports & load-bearing walls.

SCAPULAR ENGINEERING · LLC MO · AR · IL · KS · IA · NE · IN
P.E.
Professional Engineer
Scapular Engineering
Licensed
§ 01   Manufactured home — typical foundation detail
SCALE N.T.S. DRAWN JS REV 2026.01 SHEET 1 / 1
0' 10' 20' 30' 40' HUD A ROOF / TRUSS ASSY. B MH FRAME + CHASSIS C HUD DATA PLATE verified by PE D PIER (TYP.) CMU DRY-STACK E CONC. FOOTING MIN. 24"x24"x8" F GROUND ANCHOR w/ DIAGONAL STRAP G 70'-0" 14'-2" A 1 SECTION TITLE BLOCK Foundation Detail DWG-01 · REV 2026.01
ARoof & TrussLoad path continuity, truss connections, evidence of structural modification
CHUD Data PlateLocated near the electrical panel. Verified against manufacturer records
D/EPier & FootingPier spacing, footing size, material condition, bearing capacity
FAnchoringStrap count, angle, corrosion state, termination into approved anchor
A double-wide manufactured home on a permanent foundation with brick skirting and a covered porch
An engineer with a clipboard looking at the foundation of a brick bungalow
Concrete block piers and steel beams in the crawl space under a manufactured home

Specialized services. One engineering firm.

Buying a property, resolving a lender condition, or planning a renovation? Find the inspection or engineering service that fits your project, then tell us what you need to move forward.

01 / 06
Manufactured home
structural inspection
Structural inspections and engineering reports for manufactured-home purchases, refinancing, and lender property conditions. Send the property address and the report requirement to confirm the scope.
Service details → Homebuyers · loan officers · brokers
02 / 06
HUD & FHA
foundation inspection
Foundation inspections and engineering documentation for manufactured-home loan files. Clarify the lender’s condition and gather the home’s identification records before scheduling.
Service details → Loan officers · underwriters · buyers
03 / 06
PFGMH &
affixation reports
Permanent foundation certifications and affixation documentation for manufactured-home transactions. Identify the engineering report your lender or title team needs.
Service details → Title companies · lenders · owners
04 / 06
AlumiConn
wiring certification
Engineering inspections and documentation for completed aluminum wiring remediation. Share the insurer or lender’s written requirement to confirm the report scope.
Service details → Homeowners · listing agents · insurers
05 / 06
Load-bearing walls
assessment & removal design
Planning to open up a room? Get an on-site wall assessment and discuss the engineering needed for the proposed opening, supports, and permit documents before construction begins.
isitloadbearing.com → Homeowners · remodelers · contractors
06 / 06
Cornices & parapets
inspection & repair scope
Cracked, leaning, or shedding masonry at the top of an old St. Louis building? Get an independent inspection of the cornice and parapet and a written repair scope every contractor can bid.
Service details → Building owners · buyers · property managers

Building new with an FHA loan where no one issues a certificate of occupancy? See HUD-92051 compliance inspections for new construction.

PLATE02/SPECIMEN TYPICAL REPORT · 12–18 PP. · SEALED PDF

Anatomy of a sealed report.

What underwriters actually open when they receive a Scapular PDF. Every report is structured the same way regardless of which service it came from, so lenders know exactly where to find what they need.

FIG. 02 · REPORT STRUCTURE

Four sections. One sealed signature on the last page.

A Scapular report isn't a form filled in on site — it's a structured document built around how FHA and conventional underwriters process inspection files. Cover page with property identification and inspection scope. Narrative findings with referenced photos. Photo appendix documenting every structural element cited. Final page: Scapular's PE seal, signature, and license number.

The format matches what underwriters expect. That's why our first-submission approval rate has consistently landed above 98% — the reports don't need a second pass to clear underwriting.

A · Cover & ScopeProperty address, client info, inspection type, applicable loan product
B · FindingsNarrative structural evaluation with numbered references to appendix photos
C · Photo AppendixFoundation, anchoring, frame, data plate — 20 to 40 field photos typical
D · Seal & SignaturePE stamp, handwritten signature, license number, date
A
SCAPULAR ENG.PG 01
Cover & Scope
B
§ FINDINGSPG 03
Narrative
Findings
C
§ PHOTO APPX.PG 07
Photo
Documentation
D
§ CERTIFICATIONPG 18
Signed, Stamped, Sealed.
Scapular Engineering
Scapular Engineering
On the signature A PE stamp is a signature on the line that says this structure is sound. It carries liability. It closes deals that a home inspection can't.
Scapular Engineering · PE-Sealed Reports · Licensed 2019 ·

Engineering for your property. Clarity for your next step.

Buying a manufactured home, clearing a lender’s condition, arranging wiring documentation, or planning a wall removal? Find the service that fits your property and the decision ahead.

Buying. Refinancing. Renovating.

Get the right advice. Order the right report.

Explore focused help for foundations, manufactured homes, aluminum wiring, and load-bearing walls. Each service explains what to prepare, what the inspection covers, and how to get started.

Have more than one requirement for the same property? Share the written requests so we can discuss the engineering work and reports you need.

Browse inspection guides and checklists

Scapular property services: manufactured homes, FHA foundations, affixation, aluminum wiring, and load-bearing walls PROPERTY SERVICES FIG. 01 INSPECTIONS · REPORTS · RENOVATION GUIDANCE FIVE SPECIALTIES SERVICE 01 MFG Manufactured Home Structural inspectmfg.com SERVICE 02 FHA HUD / FHA Underwriting-Ready inspectfha.com SERVICE 03 PFGMH Affixation & Foundation affixreport.com SERVICE 04 STL Alumiconn Certification alumiconn.org SERVICE 05 Load-bearing walls Plan your opening IsItLoadBearing.com ●   THE FIRM   ● Scapular Engineering scapularengineering.com P.E. LICENSED MO · AR · IL · KS · IA · NE · IN

Seven states. One engineer. One turnaround time.

Find your state and nearby cities below. Share your property address and deadline so we can confirm service availability and the next inspection window.

MIDWEST · FIG. 02 SCALE: N.T.S. COVERAGE MAP / 2026 7 STATES
  • MO Missouri
    All 4 services · STL & KC Alumiconn
    Active
  • AR Arkansas
    MFG · FHA · PFGMH
    Active
  • IL Illinois
    MFG · FHA · PFGMH
    Active
  • KS Kansas
    MFG · FHA · PFGMH
    Active
  • IA Iowa
    MFG · FHA · PFGMH
    Active
  • NE Nebraska
    MFG · FHA · PFGMH
    Active
  • IN Indiana
    MFG · FHA · PFGMH
    Active
Alumiconn geographic restriction Aluminum-wiring certification has a separate service area. Confirm eligibility for the property before ordering. Check your property →

The numbers behind the seal.

Scapular's inspection record, measured across our services and seven licensed states since 2019.

5,000+
PE-sealed inspections
delivered since 2019
Across our services
24hrs
Average report
turnaround time
From inspection to sealed PDF
98%
First-submission
underwriter approval
Reports clear on first pass
50+
Active lender & realtor
partners in the network
Repeat volume clients

Why a licensed engineer — and why Scapular.

Every report Scapular delivers is stamped by a Professional Engineer in good standing. That signature isn't a formality — it's a legal credential that carries weight with underwriters, insurers, and title companies.

Eight years of pipeline. Two multi-day exams. Continuing-education every cycle. That's what the two letters represent — and why FHA requires them specifically.
01

Licensed in seven states

Scapular Engineering holds active PE licenses in Missouri, Arkansas, Illinois, Kansas, Iowa, Nebraska, and Indiana. One firm, one seal, every report in the network.

02

HUD & FHA fluent

Reports are formatted to FHA underwriting requirements out of the box — HUD data plate verification, permanent foundation compliance, and appendix-ready photo documentation.

03

Underwritten by liability, not marketing

A Scapular stamp is professionally insured and legally binding. When an underwriter requires a PE signature, this is the signature they're asking for.

04

One firm for the whole file

Need a structural inspection and a PFGMH report on the same property? One order. One engineer on site. One invoice. The network is built for exactly this.

Read more about the firm & the engineer →

How do I find a structural engineer in St. Louis?

Check two things first: that the engineer holds an active Professional Engineer (P.E.) license in the state where the property sits, and that the written quote names the exact report your lender, insurer, or permit office asked for. Scapular Engineering serves St. Louis and holds active PE licenses in seven states, including Missouri and Illinois.

01

Confirm the license

Look the engineer up on the state licensing board's public lookup. The license has to be active where the property sits: Missouri for St. Louis City and County, Illinois for the Metro East.

02

Match the report to the requirement

Read the condition your lender, insurer, or permit office sent, and make sure the written quote names that exact report. A general inspection does not stand in for a sealed engineering letter.

03

Ask who visits and who seals

The P.E. responsible for the report signs and seals it. Ask who makes the site visit and when the sealed PDF arrives. Most Scapular site visits take 45 to 90 minutes.

Request to report, in four steps.

Every inspection in the network — regardless of which spoke site it's ordered from — follows the same workflow. This is it.

01

Request

Submit the property address, inspection type, and lender contact through the relevant site. The hub routes the request to the right service queue automatically.

Day 0 · 3 minutes
02

Schedule

We confirm property access and arrange the field visit. Your quote confirms the field-visit window, report-delivery target, and any rush fee.

Day 0–2
03

Inspect

Field inspection, photo documentation, foundation measurements, and any additional tests the scope requires. Most properties take 45–90 minutes on site.

Day 2–3 · 45–90 min
04

Deliver

Our P.E. reviews the findings and signs and seals the report. We deliver the PDF on the schedule confirmed in your quote and help with questions about the engineering findings.

Day 3–4 · Sealed PDF

For lenders and realtors closing volume.

If you're sending Scapular more than four inspections a quarter, the partner program is built for you. Priority scheduling, dedicated direct line, invoice-at-close billing, and white-labeled report delivery where your firm's logo sits next to ours.

  • Priority scheduling — 24hr turnaround guarantee
  • Invoice-at-close billing for escrow integration
  • Dedicated account line, direct to your account contact
  • Volume pricing on networks of 10+ per quarter
  • Quarterly reporting on inspection outcomes

Order an inspection.

Tell us the property address, what your lender requested, and your deadline. We’ll help identify the report you need and confirm the scope and schedule before you proceed.